EXPLORE
CONTACT US

Deliver your next
project with confidence

SYDNEY

(02) 9060 7222
Level 4, 157 Walker Street
North Sydney, NSW 2060

CANBERRA

(02) 5104 0144
Level 1, 243 Northbourne Avenue
Lyneham, ACT 2602

SYDNEY
CANBERRA

Contact UsContact Us

Stubbo Solar Farm

SERVICE

Planning & Advisory, Engineering

CLIENT

ACEN Australia

PARTNERS

Ramboll

ABORIGINAL COUNTRY

Widajuri

Stubbo Solar Farm

ACEN Australia is developing the Stubbo Solar Farm, a grid-connected photovoltaic solar farm of up to 400 megawatts, along with associated infrastructure, such as an on-site substation, transmission infrastructure and battery energy storage system, located about 90km east of Dubbo and about 10km north of Gulgong in the Mid-Western Regional Council local government area of NSW. The proposed site is located within Australia’s first ever Renewable Energy Zone (REZ) – the Central-West Orana REZ.

In collaboration with Ramboll, SCT Consulting led the preparation of the Traffic and Transport Assessment of the EIS. Transport assessment was considered a significant component of the EIS and included the assessment of construction traffic impacts along the construction access routes and critical intersections for a peak scenario, including geometric and sight distance reviews.

Appraisal of construction traffic impacts on all modes of transport was conducted as well as advice on mitigation measures, including any road upgrades, changes to sealed widths, and construction traffic management plans. Additional tasks included managing the traffic surveys, technical assessments, future growth forecasting and production of the report, as well as reviewing transport items within the body of the main EIS.